Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2 SD adit of the 'Blagodat' mine
Apriori ocena tačnosti proboja u horizontalnoj ravni između VI horizonta i potkopa P2 SD jame 'Blagodat'
Abstract
The construction of a crosscut in a sense of mine surveying is a hard and responsible job. This refers especially to the construction of longer crosscuts, considering the fact that, during its construction, there is no possibility for independent control of its execution. Therefore, in such cases, it is necessary to carry out prior analysis of the crosscut accuracy, where, based on all required elements, total standard tolerance of crosscut is to be calculated, and this must be less than default permitted tolerance. This paper shows a priori analysis of the crosscut accuracy that is to be executed with length of 1,192.43 m at the lead and zinc mine 'Blagodat' for the purpose of ore transport.References
GANIĆ, A. et al. (1994) Određivanje položajne greške poslednje tačke u vlaku pri izradi jamskih prostorija u rudniku "Jarando". Podzemni radovi , 4,
pp.11-16.
PATARIĆ, M. (1990) Rudarska merenja I deo . Beograd: Rudarsko-geološki fakultet.
STOILJKOVIĆ, V. (2012) Dopunski rudarski projekat analize greške proboja između VI horizonta jame "Blagodat" i potkopa P2 SD rudnog polja "Blagodat" . Vranje: Rudnik olova i cinka "Grot".
VULIĆ, M. and URANJEK, G. (2007) A contribution to construction monitoring with simultaneous application of various types of observations. RMZ – Materials and Geoenvironment , 54 (2), pp. 247-263.
pp.11-16.
PATARIĆ, M. (1990) Rudarska merenja I deo . Beograd: Rudarsko-geološki fakultet.
STOILJKOVIĆ, V. (2012) Dopunski rudarski projekat analize greške proboja između VI horizonta jame "Blagodat" i potkopa P2 SD rudnog polja "Blagodat" . Vranje: Rudnik olova i cinka "Grot".
VULIĆ, M. and URANJEK, G. (2007) A contribution to construction monitoring with simultaneous application of various types of observations. RMZ – Materials and Geoenvironment , 54 (2), pp. 247-263.
Published
2017-03-19
How to Cite
Stoiljković, V., Milutinović, A., Ganić, A., & Mikanović, R. (2017). Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2 SD adit of the ’Blagodat’ mine. Podzemni Radovi, (23), 33-44. Retrieved from https://ume.rgf.bg.ac.rs/index.php/ume/article/view/49