1.
Selecting the optimal drilling and blasting design for underground excavations in underground copper mine “Jama” Bor. ume [Internet]. 2018 Dec. 31 [cited 2026 Nov. 19];(33):53-60. Available from: https://ume.rgf.bg.ac.rs/index.php/ume/article/view/121