“Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2 SD adit of the ’Blagodat’ mine: Apriori ocena tačnosti proboja u horizontalnoj ravni između VI horizonta i potkopa P2 SD jame ’Blagodat’” (2017) Podzemni radovi, (23), pp. 33–44. Available at: https://ume.rgf.bg.ac.rs/index.php/ume/article/view/49 (Accessed: 4 November 2026).