Experimental determination of best performing cut in Lece underground mine
Abstract
Development operation in underground mining require high performance drilling and blasting. In order to determine best performing cut in Lece mine series of experiments were conducted. It was noticed that sequencing of initiation has crucial impact on cut performance. Line cut had experienced filling of empty holes with blasted material that was indistinguishable from the main rock. Finally, best results were obtained by delayed initiation of charges in circular pattern. Such cut construction provided complete hole recovery instead of previous poor results.
References
AYALACARCEDO, F. (2017) Drilling and blasting of rocks. Routledge.
DURANOVIĆ, M. et al. (2018) Optimization of ring blasting in sublevel stoping gold mine. Podzemni radovi, pp. 61-68.
TORBICA, S., and LAPČEVIĆ, V. (2015) Estimating extent and properties of blast-damaged zone around underground excavations. Rem: Revista Escola de Minas, 68, pp. 441-453.
TORBICA, S., and LAPČEVIĆ, V. (2016) Blast-induced damage and its impact on structural stability of underground excavations. Podzemni radovi, pp. 33-42.
TORBICA, S., and LAPČEVIĆ, V. (2018) Rock fracturing mechanisms by blasting. Podzemni radovi, pp. 15-31.
XU, S. et al. (2019) Optimization of blasting parameters for an underground mine through prediction of blasting vibration. Journal of Vibration and Control, 25, pp. 1585-1595.
ZHANG, Z.-X. (2016) Chapter 17 - Rock Blasting in Open Cut and Tunneling. In Z.-X. Zhang (Ed.), Rock Fracture and Blasting pp. 334-352, Butterworth-Heinemann.