Skip to main content Skip to main navigation menu Skip to site footer
Page Header Logo
  • Current
  • Archives
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
    • Contact
Search
  • Register
  • Login
  1. Home /
  2. Archives /
  3. No 28 (2016)

Published: 2016-06-30

Articles

  • Reasons for difference between real and projected operating supplies for supporting during construction of ramps Upoređenje potrošenenih i projektovanih količina podgradnih materijala tokom izrade otkopne rampe
    Nikolinka Doneva, Zoran Despodov, Dejan Mirakovski, Marija Hadži-Nikolova, Stojanče Mijalkovski
    1-7
    • PDF
  • Model for estimation of stress field in the Earth's crust Model za procenu napregnutosti Zemljine kore
    Slavko Torbica, Veljko Lapčević
    9-17
    • PDF
  • Small oilfield integrated production management model Integralni model upravljanja proizvodnjom na malim naftnim poljima
    Dušan Danilović, Vesna Karović-Maričić, Branko Leković
    19-27
    • PDF
  • The radial cutting torch device application due to drill string sticking Primena radijalnog plazma rezača prilikom zaglave bušaćeg alata
    Branko Leković, Nenad Šumar, Vesna Karović-Maričić, Dušan Danilović
    29-38
    • PDF
  • Synrift and postrift miocene sediments of northern Banat, Serbia Sinriftni i postriftni miocenski sedimenti severnog Banata u Srbiji
    Dejan Radivojević, Ljupko Rundić
    39-60
    • PDF
  • Mining activities through history at Avala locality Rudarske aktivnosti na lokalitetu Avale kroz istoriju
    Luka Crnogorac
    61-67
    • PDF
Make a Submission
Information
  • For Authors

 eISSN 2560-3337
   ISSN 0354-2904

Published by:
University of Belgrade -
Faculty of Mining and Geology

 

Indexed by:
     DOAJ
     GoogleScholar

About this Publishing System