1.
Selecting the Suitable Rock Excavation Method of Hard Rock Removal for Constructing a Ground Level Service Reservoir at Hill Top in Urban Population. ume [Internet]. 2025 Dec. 30 [cited 2026 Nov. 4];1(47):83-102. Available from: https://ume.rgf.bg.ac.rs/index.php/ume/article/view/231