[1]
“A-PRIORI ACCURACY ASSESSMENT OF TRACING THE CUT-TROUGH IN THE VERTICAL PLANE DURING THE CONSTRUCTION OF THE HOULAGE DRIFT IN THE ’’GROT’’ MINE”, ume, vol. 1, no. 46, pp. 175–188, July 2025, doi: 10.5937/podrad2501175G.