“A-PRIORI ACCURACY ASSESSMENT OF TRACING THE CUT-TROUGH IN THE VERTICAL PLANE DURING THE CONSTRUCTION OF THE HOULAGE DRIFT IN THE ’’GROT’’ MINE” (2025) Podzemni radovi, 1(46), pp. 175–188. doi:10.5937/podrad2501175G.