“Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU ’Soko’ mine shaft: Apriori ocena tačnosti proboja u horizontalnoj ravni između GVH-1 i VU-1 jame RMU ’Soko’” (2015) Podzemni radovi, (27), pp. 23–30. doi:10.5937/podrad1527023B.