“The implementation of modified pillar method in the excavation field 2 (OP-2) in the ’Osojno-jug’ RL ’Lubnica’ Mine: Primena modifikovane stubne metode u otkopnom polju 2 (OP-2) u jami ’Osojno-jug’ RL ’Lubnica’” (2015) Podzemni radovi, (27), pp. 11–21. doi:10.5937/podrad1527011D.