A-PRIORI ACCURACY ASSESSMENT OF TRACING THE CUT-TROUGH IN THE VERTICAL PLANE DURING THE CONSTRUCTION OF THE HOULAGE DRIFT IN THE ’’GROT’’ MINE. (2025). Podzemni Radovi, 1(46), 175-188. https://doi.org/10.5937/podrad2501175G