Reasons for difference between real and projected operating supplies for supporting during construction of ramps: Upoređenje potrošenenih i projektovanih količina podgradnih materijala tokom izrade otkopne rampe. (2016). Podzemni Radovi, 28, 1-7. https://doi.org/10.5937/podrad1628001D