The implementation of modified pillar method in the excavation field 2 (OP-2) in the 'Osojno-jug' RL 'Lubnica' Mine

Primena modifikovane stubne metode u otkopnom polju 2 (OP-2) u jami 'Osojno-jug' RL 'Lubnica'

  • Milan Dubočanin JP PEU 'Resavica', RL 'Lubnica', Lubnica
Keywords: coal; excavation method; underground mine 'Osojno-jug'; Lubnica

Abstract

According to the present geologic conditions, designing the modified pillar method of excavation with felling roof coaland collapsing the roof is mandatory and that is one of the goals of this method. Considering the planned growth in production in OP-2, the need for the modification of present coal exploitation in the deposit of the 'Lubnica' pit is imposed. The fact that the present method of coal excavation marks more than 40% loss of balance reserves, which is unacceptable amount of excavation loss, is the main reason for changing the excavation method.

References

ANTUNOVIĆ-KOBLIŠKA, M. (1963) General mining works (in Serbian). Belgrade: Institute for publishing textbooks of SR Serbia.

ANTUNOVIĆ-KOBLIŠKA, M. (1966) Mechanics of rocks in mining, I and II part (in Serbian). Belgrade: Faculty of Mining and Geology.

GENČIĆ, B. (1972) Technological processes of underground exploitation of stratified deposits (in Serbian). Belgrade: Institute for textbooks and teaching material.

GLUŠČEVIĆ, B. (1974) Opening and underground ore deposits excavation (in Serbian). Subotica: Minerva.

Technical documentation of the "Lubnica" mine.
Published
2015-12-31
How to Cite
Dubočanin, M. (2015). The implementation of modified pillar method in the excavation field 2 (OP-2) in the ’Osojno-jug’ RL ’Lubnica’ Mine. Podzemni Radovi, (27), 11-21. https://doi.org/10.5937/podrad1527011D
Section
Articles