The implementation of modified pillar method in the excavation field 2 (OP-2) in the 'Osojno-jug' RL 'Lubnica' Mine
Primena modifikovane stubne metode u otkopnom polju 2 (OP-2) u jami 'Osojno-jug' RL 'Lubnica'
DOI:
https://doi.org/10.5937/podrad1527011DKeywords:
coal; excavation method; underground mine 'Osojno-jug'; LubnicaAbstract
According to the present geologic conditions, designing the modified pillar method of excavation with felling roof coaland collapsing the roof is mandatory and that is one of the goals of this method. Considering the planned growth in production in OP-2, the need for the modification of present coal exploitation in the deposit of the 'Lubnica' pit is imposed. The fact that the present method of coal excavation marks more than 40% loss of balance reserves, which is unacceptable amount of excavation loss, is the main reason for changing the excavation method.
References
ANTUNOVIĆ-KOBLIŠKA, M. (1963) General mining works (in Serbian). Belgrade: Institute for publishing textbooks of SR Serbia.
ANTUNOVIĆ-KOBLIŠKA, M. (1966) Mechanics of rocks in mining, I and II part (in Serbian). Belgrade: Faculty of Mining and Geology.
GENČIĆ, B. (1972) Technological processes of underground exploitation of stratified deposits (in Serbian). Belgrade: Institute for textbooks and teaching material.
GLUŠČEVIĆ, B. (1974) Opening and underground ore deposits excavation (in Serbian). Subotica: Minerva.
Technical documentation of the "Lubnica" mine.
ANTUNOVIĆ-KOBLIŠKA, M. (1966) Mechanics of rocks in mining, I and II part (in Serbian). Belgrade: Faculty of Mining and Geology.
GENČIĆ, B. (1972) Technological processes of underground exploitation of stratified deposits (in Serbian). Belgrade: Institute for textbooks and teaching material.
GLUŠČEVIĆ, B. (1974) Opening and underground ore deposits excavation (in Serbian). Subotica: Minerva.
Technical documentation of the "Lubnica" mine.
Downloads
Published
2015-12-31
Issue
Section
Articles
How to Cite
The implementation of modified pillar method in the excavation field 2 (OP-2) in the ’Osojno-jug’ RL ’Lubnica’ Mine: Primena modifikovane stubne metode u otkopnom polju 2 (OP-2) u jami ’Osojno-jug’ RL ’Lubnica’. (2015). Podzemni Radovi, 27, 11-21. https://doi.org/10.5937/podrad1527011D