Božinovska, T., Milutinović, A., Gojković, Z. and Ganić, A. (2015) “Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU ’Soko’ mine shaft”, Podzemni radovi, (27), pp. 23-30. doi: 10.5937/podrad1527023B.