Dubočanin, M. (2015). The implementation of modified pillar method in the excavation field 2 (OP-2) in the ’Osojno-jug’ RL ’Lubnica’ Mine. Podzemni Radovi, (27), 11-21. https://doi.org/10.5937/podrad1527011D