TY - JOUR AU - Nikolinka Doneva AU - Zoran Despodov AU - Dejan Mirakovski AU - Marija Hadži-Nikolova AU - Stojanče Mijalkovski PY - 2016/06/30 Y2 - 2024/03/29 TI - Reasons for difference between real and projected operating supplies for supporting during construction of ramps JF - Podzemni radovi JA - ume VL - 0 IS - 28 SE - Articles DO - 10.5937/podrad1628001D UR - https://ume.rgf.bg.ac.rs/index.php/ume/article/view/15 AB - Exactly established longitudinal profile, as well as physical -mechanical properties of all lithological units along the route of a mining facilityare very important for the design of an underground mining facilities. This paperpresents the construction of ramp in an underground mine in Macedonia, wherereal and projected supporting operating supplies are compared. ER -