Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist

  • Nikolinka Doneva Faculty of natural and technical science, Goce Delchev University, Stip, Macedonia
  • Zoran Despodov Faculty of natural and technical science, Goce Delchev University, Stip, Macedonia
  • Dejan Mirakovski Faculty of natural and technical science, Goce Delchev University, Stip, Macedonia
  • Marija Hadzi-Nikolova Faculty of natural and technical science, Goce Delchev University, Stip, Macedonia
  • Stojance Mijalkovski Faculty of natural and technical science, Goce Delchev University, Stip, Macedonia
Keywords: uniaxial compressive strength; cross-section area; rock bolts; mesh; sprayed concrete;

Abstract

This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.

References

CUMMINGS, R. A., KENDORSKI, F. S. and BRENIAWSKI, Z. T. (1984) Caving rock mass classification and support estimation. Bureau of Mines.

DONEVA, N. (2011) ‘Methodology for determination of functional dependence of expenditure by rock’s type and size of the profile of construction horizontal mining facilities’. Thesis (PhD), Goce Delchev University, Shtip.

DONEVA, N. et al. (2013) Rock mass classification and their usage in mining. In: Proceeding of the XIIth national conference with international participation of the open and underwater mining of minerals. Varna, Bulgaria: Scientific and Technical Union of Mining, Geology and Metallurgy, pp. 279 – 283.

DONEVA, N. et al. (2012a) Influence on structural characteristic of the rock material on expenditures for construction on horizontal mining facilities. Natural resources and technologies, VI (6). pp. 5-14.

DONEVA, N. et al. (2012b) The influence of the rock type on the time for the construction of horizontal facilities. Mining and geology, VIII (8), pp 12-15.

DONEVA, N. et al. (2015) Cost Analysis in the Construction of Underground Mining Structures and Opportunities for Their Reduction. The Mining-Geology-Petroleum Engineering Bulletin, 30 (2), pp. 1-12.

JOVANOVIC, P. (1994) Design and calculation of support horizontal mining facility - first book. Belgrade: University of Belgrade - Faculty of Mining and Geology.

MILANOVIC, P. and TORBICA, S. (1997) Rock mass classifications and its application. Belgrade: Belgrade: University of Belgrade - Faculty of Mining and Geology.

Published
2019-06-30
How to Cite
Doneva, N., Despodov, Z., Mirakovski, D., Hadzi-Nikolova, M., & Mijalkovski, S. (2019). Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist. Podzemni Radovi, (34), 1-9. https://doi.org/10.5937/PodRad1934001D
Section
Articles